NovoSpill

Industrial

NovoSpill

Hydrocarbon spill bioremediation

The setting

An industrial site where routine workshop wash-bay discharge was accumulating in a concrete-lined settlement dam, roughly 230kg of TPH entering it every month.

The problem

The dam was holding close to 2 tons of total petroleum hydrocarbons. Excavation and off-site purification were logistically difficult and expensive; chemical dispersants risked harming the surrounding ecosystem.

How NovoSpill helped

NovoSpill was applied directly to the dam surface in three treatments over a 5-month period, calibrated to the estimated TPH load.

Result

TPH levels dropped 85% within 3 months of the first application, with a further 90% reduction following the second and third treatments.

Industrial settlement dam, ~230kg TPH/month inflow

Applications

  • Pipeline and flowline leaks
  • Tank farm and wellhead spills
  • Surface spills on soil (workshops, refuelling stations, transport yards)
  • Contaminated freshwater or seawater
  • Drill cuttings and mud pits
  • Tank cleaning and maintenance
  • Coastal and tidal zone remediation
  • Pit closures and legacy contamination

Sizes

500g · 1kg · 5kg · 25kg

Storage

Store in a cool, dry area. Protect containers from damage.

Application rate

Typical application: 400 mL diluted product per 2 L water per square metre of contaminated area (source: UK distributor site, dnsenviro.co.uk).